How Do You Ensure Accurate Copper Testing?

When planning a copper project—whether from mined ore or recycled scrap—your lab results dictate project viability, recovery efficiency, smelter compliance, and cost controls. Faulty sampling leads to inaccurate grade data, missed penalties, and expensive engineering errors.

At PRS, we ensure not only reliable testing—but reliable sampling.

Copper Scrap Sample Preparation

Key Steps:

  • Melt scrap(e.g. wire, granules) into ingots
  • Drill coresat multiple locations for representativity
  • Grind & sieve, dividing into:
    • Sieve top (+180 mesh)
    • Sieve bottom (180 mesh)
  • Package each fraction separately, clearly labeled with source details

Why It Matters:
Fines and coarse fractions often have different copper or impurity levels. Segregation can lead to misleading assay results and unanticipated penalties.

Amount & Timing:

  • 300 g per fraction (600 g total)
  • Testing results delivered in approx. 2 weeks

Copper Ore Sample Preparation

What to Do:

  • Grind to 180 mesh (~80µm)using vibratory or similar mills
  • Submit at least 300gof ground sample (500 g recommended for ores with gold/silver)

Testing Choices & Timing:

Analysis Type

Method

Turnaround Time

Copper Only

AAS (Atomic Absorption)

10–12 days

Cu + Au + Ag

Fire Assay + AAS

~14 days

Full Element Suite

ICPMS + XRF

14–21 days

Tip: Add trace elements like As, Sb, or Bi in your request if needed.

Why PRS Sample Protocols Outperform

  • Scientific Accuracy:Grinding to 80 µm achieves >95% liberation; scrap melting avoids “hot spot” bias
  • Fast Turnaround:Standard testing in ~2 weeks—faster than many labs; rush service available (7 days, +20% fee)
  • Custom Reporting:Includes LME-compliant grade certificates, penalty alerts, and blending recommendations

Your Step-by-Step Submission Guide

For Ore Samples:

  1. Grind sample to −180 mesh
  2. Weigh ~300–500 g into sealed, labeled bags with deposit/project info

For Scrap Samples:

  1. Melt scrap into an ingot
  2. Drill, grind, sieve into top & bottom fractions
  3. Package 300 g separately with clear labels

After Sending Samples:

  • Testing begins immediately upon receipt
  • You’ll receive full results and practical recommendations in ~2 weeks

Invest with Confidence—Start with Precision

Proper sampling saves time, money, and operational headaches. With PRS, your investment is backed by reliable data and expert guidance.

 

Need help or want a quote? Contact our team today to get your sample testing underway—and build your copper project on solid foundations.

More To Explore

For Small Copper or Zinc Plant, No Supplier to Support You?

drop us a line and keep in touch

Copper EW plant view
Fill out the form below, and we will be in touch shortly.